If you’ve been in preconstruction long enough, you must have seen this play out:

The estimate looked right on paper. The numbers made sense. But as soon as the machines hit the ground, the surprises started: delays, rework, and budgets that didn't hold up. 

As it turns out, the takeoff never factored in the actual ground conditions. Now, the budget’s crumbling, and the schedule’s blown.

Sound familiar?

It happens more often than you’d think. Not because estimators ignore ground conditions but because Ground Investigation (GI) data is often siloed or gets delayed in the preconstruction phase.

That’s why it’s important to not just access GI data but actually use it in your workflows. GI data isn't just an engineering formality. When plugged into your takeoff workflows early, it can be the difference between a smooth build and a string of costly change orders.   

In this blog post, we’ll break down how integrating GI data into your takeoff workflows is no longer optional and how it can help estimators improve accuracy, reduce surprises, and bid with confidence.

Let’s dig in. 

What is Ground Investigation Data?

Ground Investigation (GI) data is the information collected about what’s beneath the surface of a construction site. It helps determine whether the land is suitable for construction and guides how excavation, drainage, and foundations should be approached. It typically includes:

  • Borehole logs (to see what layers of soil or rock are underground)
  • Rock and groundwater levels
  • Soil strength and type
  • Presence of contaminants or stability risks

Why Estimators Can’t Ignore What’s Below 

When you’re doing a takeoff, the goal is to calculate how much material will be required for the project. But if you don’t know what’s underground, your numbers can be way off.

For example, you might estimate 100 cubic yards of soil to be removed. But what if it turns out to be heavy clay? Now, you need different equipment, more time, and a bigger budget.  

If you don’t use ground investigation data, you risk:

  • Miscalculating how much soil needs to be moved
  • Not allowing enough time for difficult ground conditions
  • Getting hit with unexpected costs later (change orders)
  • Delays due to rework or surprises on site

In short, knowing the ground conditions early helps you make better decisions and more accurate estimates.

Benefits of Integrating Ground Data with Material Takeoff

Adding ground investigation data into your takeoff process can help you avoid costly mistakes and make your estimates more accurate.

Here’s how it helps:

1. More Accurate Quantities

When you know exactly what type of soil or material is underground, you can better estimate how much needs to be excavated, filled, or replaced. This is the foundation of any solid construction cost estimate.  For example, if the ground has a rocky layer, the excavation might take longer and require different equipment. Using actual ground data helps you avoid guessing and get your cut/fill and trenching volumes right.

2. Fewer On-Site Surprises

Unexpected ground conditions are one of the most common reasons for delays and extra costs. If you hit groundwater you didn’t plan for or the soil is weaker than expected, you could face major problems. Properly anticipating soil types, water levels, or rock presence prevents rework and delays. 

3. Smarter Cost Planning

With better information, you can create more realistic budgets. You can price in things like dewatering, soil improvement, or material hauling only when it’s necessary–making your bid more competitive without adding risky contingencies..

4. Better Team Coordination

When the estimating team and the engineering team both use the same ground data, everyone’s on the same page. This leads to better planning,  smoother communication, and avoiding scope mismatches during pre-construction.

The New Estimating Workflow- Powered by Data 

Many estimating teams are already looking for ways to improve accuracy by using more comprehensive site data. 

As construction workflows become increasingly connected and data-driven, integrating ground investigation data into takeoff processes is becoming more and more practical. Here's how to integrate GI data into your takeoff workflow:

1. Collect the Ground Data Early

Start by getting all the available ground investigation information from your geotechnical team. This includes borehole logs, soil test results, groundwater data, and any other site-specific reports. Request it  in digital formats like AGS or Excel—it’s easier to analyze or integrate with your construction takeoff software

2. Organize and Link It to the Site Plan

Once you have the data, the next step is to align it with your site drawings or models. This could mean overlaying borehole locations on a CAD file or BIM model, or simply using a map to see where different soil types are located. This helps estimators see where the ground will behave differently and plan takeoff accordingly.is to understand how the ground conditions vary across the project area.

3. Refine Your Takeoff Based on Real Conditions

Instead of using assumptions like “average soil” or “flat terrain,” you can now refine your takeoff inputs. For example:

  • Use the actual depth of topsoil or rock to estimate excavation volumes rather than assuming uniform soil conditions across the site
  • Flag areas with high groundwater
  • Plan for different equipment or timelines based on soil strength or type

These small adjustments can lead to big improvements in accuracy.

4. Use Tools That Can Adapt as Data Evolves

Most estimators still rely on manual takeoff software that don't reflect evolving site data. As ground data becomes more structured and accessible, there’s growing potential for AI to play a bigger role. Imagine a takeoff tool that not only reads the drawings but also understands that clay soils slow down excavation or that a high water table means more pumping.

While most tools aren’t fully there yet, the industry is clearly heading in that direction. That’s why flexibility matters. Tools like Beam AI are designed to help you stay agile with automated takeoffs and automated updates for every addenda–so even when plans change, you’re always up to date without redoing your work. So, even if the data evolves or gaps emerge, you’re equipped to respond with accuracy and speed.

As technology continues to mature, the ability to seamlessly incorporate subsurface data into estimating workflows will only grow. Being ready for that shift starts with using tools that are built to adapt.

Final Thoughts

When ground conditions are overlooked, everything from budgets to timelines gets thrown off. Excavation volumes shift. Timelines stretch. Costs rise. And often, it all traces back to data that was available but never used.

Integrating Ground Investigation data doesn't have to be overwhelming–it just needs to be part of your takeoff process. With clearer insight into site conditions, you can plan more accurately, avoid rework, and bid with confidence.

As preconstruction continues to evolve, teams that tap into deeper site insights early will move faster, bid smarter, and stay ahead.

Want to see how Beam AI helps teams automate takeoffs without the extra headcount?

👉 Book a demo and experience 100% automated takeoffs.

Table of content

Ebook
Thank you! Your submission has been received!
Download ebook
Oops! Something went wrong while submitting the form.
Share this
linklinkedinfacebooktwitter
Get a Step-by-Step Beam AI Walkthrough
image
Fill out this form and see how easy it is to set up takeoffs, export reports, and get ready-to-use quantities.
Cancel
Note: After submitting the form, a Beam AI specialist will follow up to explore how AI takeoffs can boost your estimating efforts.